Business Continuity Plan for IT Services or IT infrastructure

IT services are something we all use.
Each of us uses e-banking, e-office, online shopping and many other services offered by the Internet.
And each of us wants these services to be available 24 hours a day!

 

The continuity of network service operation gives every head of the IT department sleepless nights. And each of you asks yourself one simple question: How to do it?

The Business Continuity Plan for IT Services is the answer!
The plan includes the principles of infrastructure redundancy and is usually developed according to this scenario:

Stage 1 – Audit of the IT environment

  • Hardware infrastructure and server room
    • General description of the server infrastructure
    • Inventory list of server hardware
  • Network inventory
    • Network diagram, VLAN inventory
    • VPN inventory
    • Inventory of network rules
    • Remote Access List (WAN-LAN)
  • Matrix infrastructure
    • Inventory of hardware configuration
    • Inventory of the resources served
    • Inventory of connected hosts
    • Description of the matrix state in terms of capacity and efficiency
  • Virtualization infrastructure
    • General description of virtualization systems
    • Inventory list of virtualization systems
    • Inventory list of VM
  • Inventory of virtual machines
    • Description of individual VMs with a list of installed roles, hardware parameters
    • Description of installed roles
  • Inventory of Microsoft and VMware licenses on servers
    • A general description of the use of the Microsoft license
    • Microsoft Windows Server License Requirement List (Server, CAL, RDS)
    • License Requirement List Microsoft SQL Licensing
    • License Requirement List Microsoft SQL Licensing
    • Other Microsoft Licensing Requirements List
  • Backup system inventory
    • Inventory of hardware configuration
    • Description of the environment backup schedules
  • Conclusions and recommendations
    • A general description of the condition of the infrastructure
    • List of detected threats with recommendations for changes
Zobacz podobne  What are the goals of cybersecurity?

Stage 2 – Preparation of business continuity plans for IT Services / IT Infrastructure (IT BCP) for applications and a proposal of the target architecture of IT systems implementing the assumed plan

  • Business parameters – RTO, RPO, SLA
    • Gathering information on the existing RTO, RPO, SLA times for existing applications
    • Determining the target RTO, RPO, SLA parameters for the existing applications with the client
  • IT architecture
    • Development of the target IT environment architecture that meets the expected RTO, RPO, SLA times
    • Valuation of required investments, infrastructure, systems, licenses, software, services
    • Presentation of the solution and customer acceptance
  • BCP plan
    • Development of business continuity plans for systems and applications based on the approved architecture
Zobacz podobne  Accessibility of websites and websites for everyone

Stage 3 – Implementation of business continuity plans for IT Services/IT Infrastructure (IT BCP) and the target architecture of IT systems implementing the assumed plan

  • Implementation of an investment or supervision over the implementation of an investment

 

A team of highly qualified Engineers and Specialists will advise you on how to ensure the continuity of your services.

Remember:

Luck favors the prepared!

 

Scroll to Top